Solar plant: site data

Solar power plant in Pushkino, Yaltynskyi Raion, Autonomous Republic of Crimea

Pushkino: 1,332 kWh per kWp a year, tilt 35° 1° east of south (PVGIS). 3.7% above the oblast median (1,284). #13 of 58 in the rayon, #110 of 1025 in the oblast.

Yalta, the rayon centre, is 17 km away. 272 m above sea level. 11 km away: Alushta, the nearest bigger centre, 1,288 — 3.4% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 264 km. 8.06 m between rows, pitch 11.98 m (latitude 44.6°).

Yield of 1 kWp
1,332kWh/year
Tilt
35°1° east of south
10 kW
13,318kWh/year
Row pitch
11.98m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Pushkino

The designer opens with this place’s coordinates, latitude 44.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 264 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

53Jan68Feb105Mar133Apr147May151Jun162Jul161Aug135Sep104Oct63Nov49Dec

July: 162 kWh/kWp, December: 49 — 3.3 times less.

January: 53 against 47 in the oblast, 12.8% more.

Pushkino: plants, kWh
kWpA yearJulyDecember
56,659810245
1013,3181,620490
1519,9772,430735

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yaltynskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.