Solar plant: site data

Solar power plant in Malyi Mayak, Yaltynskyi Raion, Autonomous Republic of Crimea

Malyi Mayak: 1,266 kWh per kWp a year, tilt 34° 5° east of south (PVGIS). 1.4% below the oblast median (1,284). #56 of 58 in the rayon, #798 of 1025 in the oblast.

Yalta, the rayon centre, is 20 km away. 290 m above sea level. 8 km away: Alushta, the nearest bigger centre, 1,288 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 263 km. 7.86 m between rows, pitch 11.83 m (latitude 44.6°).

Yield of 1 kWp
1,266kWh/year
Tilt
34°5° east of south
10 kW
12,656kWh/year
Row pitch
11.83m · GCR 0.40
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Malyi Mayak

The designer opens with this place’s coordinates, latitude 44.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 263 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan64Feb100Mar127Apr141May144Jun154Jul154Aug129Sep98Oct59Nov46Dec

July: 154 kWh/kWp, December: 46 — 3.3 times less.

November: 59 against 63 in the oblast, 6.3% less.

Malyi Mayak: plants, kWh
kWpA yearJulyDecember
56,328770230
1012,6561,540460
1518,9842,310690

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yaltynskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.