Solar plant: site data

Solar power plant in Peschanoye, Bakhchysaraiskyi Raion, Autonomous Republic of Crimea

Peschanoye: 1,362 kWh per kWp a year, tilt 35° 1° west of south (PVGIS). 6.1% above the oblast median (1,284). #5 of 85 in the rayon, #13 of 1025 in the oblast.

Bakhchysaray, the rayon centre, is 22 km away. 8 m above sea level. 22 km away: Bakhchysaray, the nearest bigger centre, 1,320 — 3.2% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 214 km. 8.18 m between rows, pitch 12.10 m (latitude 44.8°).

Yield of 1 kWp
1,362kWh/year
Tilt
35°1° west of south
10 kW
13,618kWh/year
Row pitch
12.10m · GCR 0.40
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Peschanoye

The designer opens with this place’s coordinates, latitude 44.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 214 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan70Feb113Mar137Apr154May153Jun164Jul162Aug137Sep108Oct67Nov47Dec

July: 164 kWh/kWp, December: 47 — 3.5 times less.

February: 70 against 64 in the oblast, 9.4% more.

Peschanoye: plants, kWh
kWpA yearJulyDecember
56,809820235
1013,6181,640470
1520,4272,460705

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bakhchysaraiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.