Solar plant: site data

Solar power plant in Andriyivka, Sevastopol City

Andriyivka: 1,390 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 4.3% above the oblast median (1,333). #1 of 42 in the oblast.

28 m above sea level. 23 km away: Sevastopol, the nearest bigger centre, 1,372 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 216 km. 8.37 m between rows, pitch 12.24 m (latitude 44.8°).

Yield of 1 kWp
1,390kWh/year
Tilt
36°3° west of south
10 kW
13,902kWh/year
Row pitch
12.24m · GCR 0.39
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Andriyivka

The designer opens with this place’s coordinates, latitude 44.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 216 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

55Jan74Feb116Mar138Apr155May153Jun164Jul162Aug138Sep111Oct72Nov52Dec

July: 164 kWh/kWp, December: 52 — 3.2 times less.

March: 116 against 108 in the oblast, 7.4% more.

Andriyivka: plants, kWh
kWpA yearJulyDecember
56,951820260
1013,9021,640520
1520,8532,460780

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

Sevastopol City: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.