Solar plant: site data
Solar power plant in Niva, Perekopskyi Raion, Autonomous Republic of Crimea
Niva: 1,308 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 1.8% above the oblast median (1,284). #38 of 84 in the rayon, #288 of 1025 in the oblast.
Yany Kapu, the rayon centre, is 58 km away. 63 m above sea level. 27 km away: Rozdolne, the nearest bigger centre, 1,319 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 128 km. 8.75 m between rows, pitch 12.62 m (latitude 45.6°).
- Yield of 1 kWp
- 1,308kWh/year
- Tilt
- 36°3° west of south
- 10 kW
- 13,076kWh/year
- Row pitch
- 12.62m · GCR 0.38
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Niva
The designer opens with this place’s coordinates, latitude 45.6° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 128 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 157 kWh/kWp, December: 44 — 3.6 times less.
March: 111 against 106 in the oblast, 4.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,538 | 785 | 220 |
| 10 | 13,076 | 1,570 | 440 |
| 15 | 19,614 | 2,355 | 660 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Tavkel-Naiman4 km1,301 kWh/kWp
- Berezovka6 km1,301 kWh/kWp
- Ryleyevka7 km1,302 kWh/kWp
- Zadornoye7 km1,307 kWh/kWp
- Kashtanovka8 km1,292 kWh/kWp
- Krasnoyarskoye8 km1,318 kWh/kWp
All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.