Solar plant: site data
Solar power plant in Kumovo, Perekopskyi Raion, Autonomous Republic of Crimea
Kumovo: 1,313 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 2.3% above the oblast median (1,284). #26 of 84 in the rayon, #246 of 1025 in the oblast.
Yany Kapu, the rayon centre, is 19 km away. 6 m above sea level. 12 km away: Rozdolne, the nearest bigger centre, the same 1,319. Snow and wind from the nearest regional centre in the DBN — Херсон, 118 km. 8.89 m between rows, pitch 12.76 m (latitude 45.8°).
- Yield of 1 kWp
- 1,313kWh/year
- Tilt
- 36°2° west of south
- 10 kW
- 13,131kWh/year
- Row pitch
- 12.76m · GCR 0.37
- T_min
- -27 °Cregion V, Crimean Mountains
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Kumovo
The designer opens with this place’s coordinates, latitude 45.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 118 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 160 kWh/kWp, December: 44 — 3.6 times less.
March: 112 against 106 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,566 | 800 | 220 |
| 10 | 13,131 | 1,600 | 440 |
| 15 | 19,697 | 2,400 | 660 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Kamyshnoye7 km1,303 kWh/kWp
- Ruch’i7 km1,303 kWh/kWp
- Maksimovka8 km1,304 kWh/kWp
- Kurgannoye8 km1,315 kWh/kWp
- Botanicheskoye8 km1,313 kWh/kWp
- Fedorovka9 km1,303 kWh/kWp
All places: Perekopskyi RaionAutonomous Republic of Crimea: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.