Solar plant: site data

Solar power plant in Khutorok, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Khutorok: 1,350 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 5.1% above the oblast median (1,284). #16 of 120 in the rayon, #28 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 18 km away. 17 m above sea level. 18 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 160 km. 8.58 m between rows, pitch 12.45 m (latitude 45.3°).

Yield of 1 kWp
1,350kWh/year
Tilt
36°3° west of south
10 kW
13,495kWh/year
Row pitch
12.45m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Khutorok

The designer opens with this place’s coordinates, latitude 45.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 160 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

54Jan68Feb114Mar137Apr152May151Jun162Jul159Aug135Sep105Oct66Nov47Dec

July: 162 kWh/kWp, December: 47 — 3.4 times less.

January: 54 against 47 in the oblast, 14.9% more.

Khutorok: plants, kWh
kWpA yearJulyDecember
56,748810235
1013,4951,620470
1520,2432,430705

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.