Solar plant: site data

Solar power plant in Abrykosivka, Yevpatoriiskyi Raion, Autonomous Republic of Crimea

Abrykosivka: 1,362 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 6.1% above the oblast median (1,284). #6 of 120 in the rayon, #12 of 1025 in the oblast.

Yevpatoriya, the rayon centre, is 16 km away. 33 m above sea level. 16 km away: Yevpatoriya, the nearest bigger centre, 1,338 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 159 km. 8.59 m between rows, pitch 12.46 m (latitude 45.3°).

Yield of 1 kWp
1,362kWh/year
Tilt
36°3° west of south
10 kW
13,621kWh/year
Row pitch
12.46m · GCR 0.38
T_min
-27 °Cregion V, Crimean Mountains
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Abrykosivka

The designer opens with this place’s coordinates, latitude 45.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 159 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

53Jan68Feb115Mar138Apr155May152Jun163Jul160Aug137Sep107Oct68Nov48Dec

July: 163 kWh/kWp, December: 48 — 3.4 times less.

January: 53 against 47 in the oblast, 12.8% more.

Abrykosivka: plants, kWh
kWpA yearJulyDecember
56,811815240
1013,6211,630480
1520,4322,445720

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Yevpatoriiskyi RaionAutonomous Republic of Crimea: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.