Solar plant: site data
Solar power plant in Syrvatyntsi, Khmelnytskyi Raion, Khmelnytskyi Oblast
Syrvatyntsi: 1,124 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.2% above the oblast median (1,100). #34 of 576 in the rayon, #194 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 51 km away. 287 m above sea level. 11 km away: Horodok, the nearest bigger centre, 1,101 — 2.1% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 52 km. 11.02 m between rows, pitch 14.89 m (latitude 49.1°).
- Yield of 1 kWp
- 1,124kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,240kWh/year
- Row pitch
- 14.89m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Syrvatyntsi
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 52 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 33 — 4.3 times less.
January: 37 against 32 in the oblast, 15.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,620 | 705 | 165 |
| 10 | 11,240 | 1,410 | 330 |
| 15 | 16,860 | 2,115 | 495 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Mala Yaromyrka2 km1,126 kWh/kWp
- Skypche3 km1,126 kWh/kWp
- Velyka Yaromyrka4 km1,118 kWh/kWp
- Kupyn5 km1,123 kWh/kWp
- Velyka Levada7 km1,113 kWh/kWp
- Lisohirka7 km1,121 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.