Solar plant: site data
Solar power plant in Kupyn, Khmelnytskyi Raion, Khmelnytskyi Oblast
Kupyn: 1,123 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.1% above the oblast median (1,100). #42 of 576 in the rayon, #204 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 46 km away. 237 m above sea level. 8 km away: Horodok, the nearest bigger centre, 1,101 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 47 km. 11.03 m between rows, pitch 14.90 m (latitude 49.1°).
- Yield of 1 kWp
- 1,123kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 11,231kWh/year
- Row pitch
- 14.90m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Kupyn
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 47 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 32 — 4.4 times less.
January: 36 against 32 in the oblast, 12.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,616 | 705 | 160 |
| 10 | 11,231 | 1,410 | 320 |
| 15 | 16,847 | 2,115 | 480 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Velyka Levada4 km1,113 kWh/kWp
- Lisohirka4 km1,121 kWh/kWp
- Stara Pisochna4 km1,112 kWh/kWp
- Nova Pisochna5 km1,113 kWh/kWp
- Velyka Yaromyrka5 km1,118 kWh/kWp
- Mala Yaromyrka5 km1,126 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.