Mala Yaromyrka: 1,126 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.3% above the oblast median (1,100). #22 of 576 in the rayon, #165 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 50 km away. 279 m above sea level. 9 km away: Horodok, the nearest bigger centre, 1,101 — 2.2% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 50 km. 11.29 m between rows, pitch 15.11 m (latitude 49.1°).

Yield of 1 kWp
1,126kWh/year
Tilt
37°1° east of south
10 kW
11,258kWh/year
Row pitch
15.11m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Mala Yaromyrka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 50 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan53Feb95Mar118Apr135May137Jun141Jul138Aug114Sep86Oct39Nov33Dec

July: 141 kWh/kWp, December: 33 — 4.3 times less.

January: 38 against 32 in the oblast, 18.8% more.

Mala Yaromyrka: plants, kWh
kWpA yearJulyDecember
55,629705165
1011,2581,410330
1516,8872,115495

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.