Solar plant: site data
Solar power plant in Partyntsi, Khmelnytskyi Raion, Khmelnytskyi Oblast
Partyntsi: 1,088 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.1% below the oblast median (1,100). #440 of 576 in the rayon, #875 of 1109 in the oblast.
Khmelnytskyi, the rayon centre, is 58 km away. 272 m above sea level. 18 km away: Starokostyantyniv, the nearest bigger centre, 1,094 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 57 km. 11.73 m between rows, pitch 15.60 m (latitude 49.9°).
- Yield of 1 kWp
- 1,088kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 10,876kWh/year
- Row pitch
- 15.60m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Partyntsi
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 57 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, January: 27 — 5.2 times less.
January: 27 against 32 in the oblast, 15.6% less.
| kWp | A year | July | January |
|---|---|---|---|
| 5 | 5,438 | 705 | 135 |
| 10 | 10,876 | 1,410 | 270 |
| 15 | 16,314 | 2,115 | 405 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Velyka Shkarivka2 km1,088 kWh/kWp
- Hubcha3 km1,087 kWh/kWp
- Kurhanivka3 km1,088 kWh/kWp
- Kostianets4 km1,093 kWh/kWp
- Stetsky4 km1,092 kWh/kWp
- Kuchivka5 km1,091 kWh/kWp
All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.