Solar plant: site data

Solar power plant in Stetsky, Khmelnytskyi Raion, Khmelnytskyi Oblast

Stetsky: 1,092 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.7% below the oblast median (1,100). #374 of 576 in the rayon, #770 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 54 km away. 307 m above sea level. 14 km away: Starokostyantyniv, the nearest bigger centre, the same 1,094. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 53 km. 11.69 m between rows, pitch 15.56 m (latitude 49.9°).

Yield of 1 kWp
1,092kWh/year
Tilt
36°2° east of south
10 kW
10,924kWh/year
Row pitch
15.56m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Stetsky

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 53 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan49Feb85Mar118Apr134May139Jun141Jul137Aug112Sep84Oct37Nov26Dec

July: 141 kWh/kWp, December: 26 — 5.4 times less.

December: 26 against 29 in the oblast, 10.3% less.

Stetsky: plants, kWh
kWpA yearJulyDecember
55,462705130
1010,9241,410260
1516,3862,115390

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.