Solar plant: site data
Solar power plant in Koskiv, Shepetivskyi Raion, Khmelnytskyi Oblast
Koskiv: 1,093 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.6% below the oblast median (1,100). #160 of 307 in the rayon, #748 of 1109 in the oblast.
Shepetivka, the rayon centre, is 23 km away. 254 m above sea level. 23 km away: Shepetivka, the nearest bigger centre, 1,085 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 63 km. 11.79 m between rows, pitch 15.66 m (latitude 50.0°).
- Yield of 1 kWp
- 1,093kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 10,930kWh/year
- Row pitch
- 15.66m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Koskiv
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 63 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 27 — 5.2 times less.
December: 27 against 29 in the oblast, 6.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,465 | 700 | 135 |
| 10 | 10,930 | 1,400 | 270 |
| 15 | 16,395 | 2,100 | 405 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Lotivka4 km1,099 kWh/kWp
- Step5 km1,097 kWh/kWp
- Vyshneve5 km1,090 kWh/kWp
- Savertsi5 km1,099 kWh/kWp
- Lenkivtsi6 km1,097 kWh/kWp
- Andronivka6 km1,088 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.