Solar power plant in Lenkivtsi, Shepetivskyi Raion, Khmelnytskyi Oblast

Lenkivtsi: 1,097 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,100). #125 of 307 in the rayon, #640 of 1109 in the oblast.

Shepetivka, the rayon centre, is 19 km away. 262 m above sea level. 19 km away: Shepetivka, the nearest bigger centre, 1,085 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 66 km. 12.10 m between rows, pitch 15.92 m (latitude 50.0°).

Yield of 1 kWp
1,097kWh/year
Tilt
37°1° east of south
10 kW
10,966kWh/year
Row pitch
15.92m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Lenkivtsi

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 66 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan52Feb88Mar118Apr134May138Jun141Jul137Aug112Sep83Oct37Nov27Dec

July: 141 kWh/kWp, December: 27 — 5.2 times less.

December: 27 against 29 in the oblast, 6.9% less.

Lenkivtsi: plants, kWh
kWpA yearJulyDecember
55,483705135
1010,9661,410270
1516,4492,115405

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.