Solar plant: site data
Solar power plant in Savertsi, Shepetivskyi Raion, Khmelnytskyi Oblast
Savertsi: 1,099 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,100). #101 of 307 in the rayon, #576 of 1109 in the oblast.
Shepetivka, the rayon centre, is 19 km away. 275 m above sea level. 19 km away: Shepetivka, the nearest bigger centre, 1,085 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 69 km. 12.11 m between rows, pitch 15.93 m (latitude 50.0°).
- Yield of 1 kWp
- 1,099kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 10,991kWh/year
- Row pitch
- 15.93m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Savertsi
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 69 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 140 kWh/kWp, December: 27 — 5.2 times less.
December: 27 against 29 in the oblast, 6.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,496 | 700 | 135 |
| 10 | 10,991 | 1,400 | 270 |
| 15 | 16,487 | 2,100 | 405 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Lotivka2 km1,099 kWh/kWp
- Rozhychna3 km1,103 kWh/kWp
- Ustianivka4 km1,103 kWh/kWp
- Step4 km1,097 kWh/kWp
- Kosa Rishnivka4 km1,101 kWh/kWp
- Bilopil5 km1,097 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.