Solar plant: site data
Solar power plant in Yuvileyne, Khersonskyi Raion, Kherson Oblast
Yuvileyne: 1,266 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.0% above the oblast median (1,253). #49 of 109 in the rayon, #243 of 711 in the oblast.
Kherson, the rayon centre, is 49 km away. 23 m above sea level. 32 km away: Nova Kakhovka, the nearest bigger centre, 1,246 — 1.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 49 km. 9.25 m between rows, pitch 13.12 m (latitude 46.5°).
- Yield of 1 kWp
- 1,266kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,662kWh/year
- Row pitch
- 13.12m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Yuvileyne
The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 49 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 155 kWh/kWp, December: 39 — 4.0 times less.
December: 39 against 37 in the oblast, 5.4% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,331 | 775 | 195 |
| 10 | 12,662 | 1,550 | 390 |
| 15 | 18,993 | 2,325 | 585 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Stara Maiachka4 km1,261 kWh/kWp
- Druzhne5 km1,269 kWh/kWp
- Bilotserkivka7 km1,263 kWh/kWp
- Podo-Kalynivka8 km1,259 kWh/kWp
- Shchaslyve8 km1,260 kWh/kWp
- Brylivka9 km1,270 kWh/kWp
All places: Khersonskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.