Shchaslyve: 1,260 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.5% above the oblast median (1,253). #70 of 109 in the rayon, #284 of 711 in the oblast.

Kherson, the rayon centre, is 52 km away. 26 m above sea level. 25 km away: Nova Kakhovka, the nearest bigger centre, 1,246 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 52 km. 9.28 m between rows, pitch 13.15 m (latitude 46.5°).

Yield of 1 kWp
1,260kWh/year
Tilt
36°2° east of south
10 kW
12,598kWh/year
Row pitch
13.15m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Shchaslyve

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 52 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan61Feb108Mar127Apr144May143Jun154Jul153Aug131Sep100Oct56Nov38Dec

July: 154 kWh/kWp, December: 38 — 4.1 times less.

December: 38 against 37 in the oblast, 2.7% more.

Shchaslyve: plants, kWh
kWpA yearJulyDecember
56,299770190
1012,5981,540380
1518,8972,310570

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khersonskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.