Solar plant: site data
Solar power plant in Podo-Kalynivka, Khersonskyi Raion, Kherson Oblast
Podo-Kalynivka: 1,259 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #72 of 109 in the rayon, #293 of 711 in the oblast.
Kherson, the rayon centre, is 41 km away. 12 m above sea level. 32 km away: Nova Kakhovka, the nearest bigger centre, 1,246 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 41 km. 9.27 m between rows, pitch 13.14 m (latitude 46.5°).
- Yield of 1 kWp
- 1,259kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 12,587kWh/year
- Row pitch
- 13.14m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Podo-Kalynivka
The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 41 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 154 kWh/kWp, December: 38 — 4.1 times less.
January: 46 against 44 in the oblast, 4.5% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,294 | 770 | 190 |
| 10 | 12,587 | 1,540 | 380 |
| 15 | 18,881 | 2,310 | 570 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Stara Maiachka4 km1,261 kWh/kWp
- Abrykosivka5 km1,268 kWh/kWp
- Yuvileyne8 km1,266 kWh/kWp
- Druzhne11 km1,269 kWh/kWp
- Brylivka11 km1,270 kWh/kWp
- Tarasivka11 km1,269 kWh/kWp
All places: Khersonskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.