Solar plant: site data

Solar power plant in Verkhni Torhai, Henicheskyi Raion, Kherson Oblast

Verkhni Torhai: 1,228 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.0% below the oblast median (1,253). #148 of 167 in the rayon, #559 of 711 in the oblast.

Henichesk, the rayon centre, is 90 km away. 56 m above sea level. 42 km away: Hornostayivka, the nearest bigger centre, 1,236 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 127 km. 9.48 m between rows, pitch 13.35 m (latitude 46.9°).

Yield of 1 kWp
1,228kWh/year
Tilt
36°3° east of south
10 kW
12,281kWh/year
Row pitch
13.35m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Verkhni Torhai

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 127 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan57Feb103Mar124Apr142May142Jun151Jul152Aug127Sep97Oct55Nov36Dec

August: 152 kWh/kWp, December: 36 — 4.2 times less.

February: 57 against 60 in the oblast, 5.0% less.

Verkhni Torhai: plants, kWh
kWpA yearAugustDecember
56,141760180
1012,2811,520360
1518,4222,280540

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.