Solar plant: site data

Solar power plant in Nyzhni Sirohozy, Henicheskyi Raion, Kherson Oblast

Nyzhni Sirohozy: 1,228 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.0% below the oblast median (1,253). #147 of 167 in the rayon, #557 of 711 in the oblast.

Henichesk, the rayon centre, is 82 km away. 56 m above sea level. 45 km away: Vesele, the nearest bigger centre, 1,216 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 125 km. 9.46 m between rows, pitch 13.33 m (latitude 46.8°).

Yield of 1 kWp
1,228kWh/year
Tilt
36°3° east of south
10 kW
12,284kWh/year
Row pitch
13.33m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nyzhni Sirohozy

The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 125 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan57Feb103Mar123Apr142May141Jun151Jul152Aug128Sep98Oct55Nov36Dec

August: 152 kWh/kWp, December: 36 — 4.2 times less.

January: 41 against 44 in the oblast, 6.8% less.

Nyzhni Sirohozy: plants, kWh
kWpA yearAugustDecember
56,142760180
1012,2841,520360
1518,4262,280540

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.