Solar plant: site data

Solar power plant in Novodmytrivka Persha, Henicheskyi Raion, Kherson Oblast

Novodmytrivka Persha: 1,230 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.8% below the oblast median (1,253). #144 of 167 in the rayon, #542 of 711 in the oblast.

Henichesk, the rayon centre, is 75 km away. 47 m above sea level. 50 km away: Vesele, the nearest bigger centre, 1,216 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 133 km. 9.42 m between rows, pitch 13.29 m (latitude 46.8°).

Yield of 1 kWp
1,230kWh/year
Tilt
36°3° east of south
10 kW
12,303kWh/year
Row pitch
13.29m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Novodmytrivka Persha

The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 133 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan58Feb104Mar123Apr142May140Jun151Jul151Aug128Sep98Oct55Nov37Dec

July: 151 kWh/kWp, December: 37 — 4.1 times less.

January: 42 against 44 in the oblast, 4.5% less.

Novodmytrivka Persha: plants, kWh
kWpA yearJulyDecember
56,152755185
1012,3031,510370
1518,4552,265555

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.