Solar plant: site data

Solar power plant in Trokhymivka, Henicheskyi Raion, Kherson Oblast

Trokhymivka: 1,235 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.5% below the oblast median (1,253). #136 of 167 in the rayon, #507 of 711 in the oblast.

Henichesk, the rayon centre, is 71 km away. 44 m above sea level. 53 km away: Vesele, the nearest bigger centre, 1,216 — 1.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 133 km. 9.39 m between rows, pitch 13.26 m (latitude 46.7°).

Yield of 1 kWp
1,235kWh/year
Tilt
36°3° east of south
10 kW
12,348kWh/year
Row pitch
13.26m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Trokhymivka

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 133 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan58Feb104Mar123Apr143May141Jun151Jul152Aug128Sep99Oct56Nov37Dec

August: 152 kWh/kWp, December: 37 — 4.1 times less.

February: 58 against 60 in the oblast, 3.3% less.

Trokhymivka: plants, kWh
kWpA yearAugustDecember
56,174760185
1012,3481,520370
1518,5222,280555

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.