Solar plant: site data

Solar power plant in Syvashivka, Henicheskyi Raion, Kherson Oblast

Syvashivka: 1,295 kWh per kWp a year, tilt 36° facing south (PVGIS). 3.3% above the oblast median (1,253). #13 of 167 in the rayon, #108 of 711 in the oblast.

Henichesk, the rayon centre, is 31 km away. 20 m above sea level. 31 km away: Henichesk, the nearest bigger centre, 1,260 — 2.7% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 146 km. 9.12 m between rows, pitch 12.99 m (latitude 46.3°).

Yield of 1 kWp
1,295kWh/year
Tilt
36°facing south
10 kW
12,948kWh/year
Row pitch
12.99m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Syvashivka

The designer opens with this place’s coordinates, latitude 46.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 146 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan63Feb109Mar130Apr152May147Jun158Jul158Aug134Sep101Oct57Nov40Dec

July: 158 kWh/kWp, December: 40 — 4.0 times less.

December: 40 against 37 in the oblast, 8.1% more.

Syvashivka: plants, kWh
kWpA yearJulyDecember
56,474790200
1012,9481,580400
1519,4222,370600

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.