Solar plant: site data

Solar power plant in Novomykhailivka, Henicheskyi Raion, Kherson Oblast

Novomykhailivka: 1,301 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 3.8% above the oblast median (1,253). #6 of 167 in the rayon, #76 of 711 in the oblast.

Henichesk, the rayon centre, is 26 km away. 19 m above sea level. 26 km away: Henichesk, the nearest bigger centre, 1,260 — 3.2% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 150 km. 9.11 m between rows, pitch 12.98 m (latitude 46.2°).

Yield of 1 kWp
1,301kWh/year
Tilt
36°1° west of south
10 kW
13,012kWh/year
Row pitch
12.98m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novomykhailivka

The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 150 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan63Feb109Mar131Apr152May148Jun159Jul159Aug135Sep101Oct57Nov41Dec

July: 159 kWh/kWp, December: 41 — 3.9 times less.

December: 41 against 37 in the oblast, 10.8% more.

Novomykhailivka: plants, kWh
kWpA yearJulyDecember
56,506795205
1013,0121,590410
1519,5182,385615

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.