Solar plant: site data
Solar power plant in Hrynkiv, Kaluskyi Raion, Ivano-Frankivsk Oblast
Hrynkiv: 1,040 kWh per kWp a year, tilt 40° 9° east of south (PVGIS). 5.2% below the oblast median (1,097). #140 of 162 in the rayon, #638 of 700 in the oblast.
Kalush, the rayon centre, is 42 km away. 618 m above sea level — above 500 m the DBN snow and wind are higher. 34 km away: Bohorodchany, the nearest bigger centre, 1,101 — 5.6% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 51 km. 11.72 m between rows, pitch 15.38 m (latitude 48.7°).
- Yield of 1 kWp
- 1,040kWh/year
- Tilt
- 40°9° east of south
- 10 kW
- 10,396kWh/year
- Row pitch
- 15.38m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Hrynkiv
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 51 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 115 kWh/kWp, December: 44 — 2.6 times less.
November: 58 against 48 in the oblast, 20.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,198 | 575 | 220 |
| 10 | 10,396 | 1,150 | 440 |
| 15 | 15,594 | 1,725 | 660 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Lazy3 km1,040 kWh/kWp
- Kuzmynets4 km1,007 kWh/kWp
- Babske4 km1,042 kWh/kWp
- Yasen7 km1,059 kWh/kWp
- Cherepyna8 km1,042 kWh/kWp
- Osmoloda8 km971 kWh/kWp
All places: Kaluskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.