Spain: solar plant site data

Solar power plant in Zamora, Spain: yield, tilt angle and row spacing

Zamora: 1,580 kWh per kWp a year at the optimal tilt of 36°, 2° east of south (PVGIS). 2.2% below the median of the main cities of Spain (1,615). #105 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 41.8% more here.

Zamora is in the province of Zamora, Castile and León. Population 61,827 (GeoNames). 662 m above sea level. 60 km away: Salamanca, the nearest bigger city, the same 1,588 kWh/kWp. 7.00 m between rows, pitch 10.87 m, GCR 0.44 (latitude 41.5°).

Yield of 1 kWp
1,580kWh/year
Tilt
36°2° east of south
10 kW
15,801kWh/year
Row pitch
10.87m · GCR 0.44
Rank in the country
105of 147 cities

Ground frame designer

A ground frame for a solar plant: Zamora

Latitude 41.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

86Jan114Feb141Mar144Apr158May155Jun171Jul169Aug150Sep124Oct90Nov79Dec

July: 171 kWh/kWp, December: 79 — 2.2 times less.

December: 79 against the median of 103 for the main cities of Spain, 23.3% less.

Zamora: plants, kWh
kWpA yearJulyDecember
57,901855395
1015,8011,710790
1523,7022,5651,185

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Zamora: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,580—
15°1,498−5.2%
30°1,573−0.4%
45°1,565−0.9%
90°1,039−34.2%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.