Spain: solar plant site data

Solar power plant in Palencia, Spain: yield, tilt angle and row spacing

Palencia: 1,555 kWh per kWp a year at the optimal tilt of 36°, 2° east of south (PVGIS). 3.8% below the median of the main cities of Spain (1,615). #119 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 39.6% more here.

Palencia is in the province of Palencia, Castile and León. Population 78,629 (GeoNames). 739 m above sea level. 43 km away: Valladolid, the nearest bigger city, the same 1,560 kWh/kWp. 7.18 m between rows, pitch 11.05 m, GCR 0.43 (latitude 42.0°).

Yield of 1 kWp
1,555kWh/year
Tilt
36°2° east of south
10 kW
15,546kWh/year
Row pitch
11.05m · GCR 0.43
Rank in the country
119of 147 cities

Ground frame designer

A ground frame for a solar plant: Palencia

Latitude 42.0°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

85Jan107Feb136Mar139Apr154May152Jun170Jul168Aug148Sep124Oct89Nov81Dec

July: 170 kWh/kWp, December: 81 — 2.1 times less.

January: 85 against the median of 109 for the main cities of Spain, 22.0% less.

Palencia: plants, kWh
kWpA yearJulyDecember
57,773850405
1015,5461,700810
1523,3192,5501,215

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Palencia: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,555—
15°1,471−5.4%
30°1,547−0.5%
45°1,542−0.8%
90°1,035−33.4%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.