Spain: solar plant site data

Solar power plant in Palma, Spain: yield, tilt angle and row spacing

Palma: 1,598 kWh per kWp a year at the optimal tilt of 36°, facing south (PVGIS). 1.1% below the median of the main cities of Spain (1,615). #91 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 43.5% more here.

Palma is in Balearic Islands. Population 438,234 (GeoNames). 34 m above sea level. 207 km away: Barcelona, the nearest bigger city, 1,572 kWh/kWp — 1.7% more here. 6.37 m between rows, pitch 10.24 m, GCR 0.47 (latitude 39.6°).

Yield of 1 kWp
1,598kWh/year
Tilt
36°facing south
10 kW
15,983kWh/year
Row pitch
10.24m · GCR 0.47
Rank in the country
91of 147 cities

Ground frame designer

A ground frame for a solar plant: Palma

Latitude 39.6°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

106Jan110Feb141Mar147Apr157May155Jun163Jul157Aug136Sep126Oct101Nov100Dec

July: 163 kWh/kWp, December: 100 — 1.6 times less.

September: 136 against the median of 143 for the main cities of Spain, 4.9% less.

Palma: plants, kWh
kWpA yearJulyDecember
57,992815500
1015,9831,6301,000
1523,9752,4451,500

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Palma: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,598—
15°1,515−5.2%
30°1,592−0.4%
45°1,582−1.0%
90°1,042−34.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.