Spain: solar plant site data

Solar power plant in Castelldefels, Spain: yield, tilt angle and row spacing

Castelldefels: 1,585 kWh per kWp a year at the optimal tilt of 38°, 2° west of south (PVGIS). 1.9% below the median of the main cities of Spain (1,615). #101 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 42.2% more here.

Castelldefels is in the province of Barcelona, Catalonia. Population 66,375 (GeoNames). 14 m above sea level. 9 km away: Sant Boi de Llobregat, the nearest bigger city, 1,600 kWh/kWp — 1.0% less here. 7.25 m between rows, pitch 11.02 m, GCR 0.43 (latitude 41.3°).

Yield of 1 kWp
1,585kWh/year
Tilt
38°2° west of south
10 kW
15,845kWh/year
Row pitch
11.02m · GCR 0.43
Rank in the country
101of 147 cities

Ground frame designer

A ground frame for a solar plant: Castelldefels

Latitude 41.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

109Jan110Feb139Mar144Apr156May157Jun162Jul155Aug133Sep119Oct100Nov101Dec

July: 162 kWh/kWp, November: 100 — 1.6 times less.

September: 133 against the median of 143 for the main cities of Spain, 7.0% less.

Castelldefels: plants, kWh
kWpA yearJulyNovember
57,923810500
1015,8451,6201,000
1523,7682,4301,500

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.