Solar power plant in Mérida, Spain: yield, tilt angle and row spacing

Mérida: 1,615 kWh per kWp a year at the optimal tilt of 34°, 1° east of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #76 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.0% more here.

Mérida is in the province of Badajoz, Extremadura. Population 59,857 (GeoNames). 223 m above sea level. 55 km away: Badajoz, the nearest bigger city, the same 1,609 kWh/kWp. 5.87 m between rows, pitch 9.84 m, GCR 0.49 (latitude 38.9°).

Yield of 1 kWp
1,615kWh/year
Tilt
34°1° east of south
10 kW
16,152kWh/year
Row pitch
9.84m · GCR 0.49
Rank in the country
76of 147 cities

Ground frame designer

A ground frame for a solar plant: Mérida

Latitude 38.9°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

103Jan114Feb136Mar144Apr156May155Jun169Jul166Aug148Sep127Oct103Nov95Dec

July: 169 kWh/kWp, December: 95 — 1.8 times less.

December: 95 against the median of 103 for the main cities of Spain, 7.8% less.

Mérida: plants, kWh
kWpA yearJulyDecember
58,076845475
1016,1521,690950
1524,2282,5351,425

Fixed tilt facing south

What a table yields at another tilt than the optimal 34° — for roofs and frames with a standard slope.

Mérida: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
34° (optimum)1,615—
15°1,540−4.7%
30°1,611−0.3%
45°1,595−1.2%
90°1,037−35.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.