Spain: solar plant site data

Solar power plant in Melilla, Spain: yield, tilt angle and row spacing

Melilla: 1,599 kWh per kWp a year at the optimal tilt of 33°, 5° west of south (PVGIS). 1.0% below the median of the main cities of Spain (1,615). #90 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 43.6% more here.

Population 85,985 (GeoNames). 14 m above sea level. 166 km away: Roquetas de Mar, the nearest bigger city, 1,779 kWh/kWp — 10.1% less here. 4.88 m between rows, pitch 8.89 m, GCR 0.54 (latitude 35.3°).

Yield of 1 kWp
1,599kWh/year
Tilt
33°5° west of south
10 kW
15,992kWh/year
Row pitch
8.89m · GCR 0.54
Rank in the country
90of 147 cities

Ground frame designer

A ground frame for a solar plant: Melilla

Latitude 35.3°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

117Jan114Feb136Mar137Apr147May150Jun155Jul154Aug137Sep131Oct111Nov112Dec

July: 155 kWh/kWp, November: 111 — 1.4 times less.

December: 112 against the median of 103 for the main cities of Spain, 8.7% more.

Melilla: plants, kWh
kWpA yearJulyNovember
57,996775555
1015,9921,5501,110
1523,9882,3251,665

Fixed tilt facing south

What a table yields at another tilt than the optimal 33° — for roofs and frames with a standard slope.

Melilla: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
33° (optimum)1,599—
15°1,534−4.1%
30°1,595−0.3%
45°1,573−1.7%
90°998−37.6%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Spain: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.