Spain: solar plant site data

Solar power plant in Cuenca, Spain: yield, tilt angle and row spacing

Cuenca: 1,609 kWh per kWp a year at the optimal tilt of 36°, 5° east of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #80 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 44.4% more here.

Cuenca is in the province of Cuenca, Castilla–La Mancha. Population 54,898 (GeoNames). 941 m above sea level. 107 km away: Guadalajara, the nearest bigger city, the same 1,602 kWh/kWp. 6.52 m between rows, pitch 10.39 m, GCR 0.46 (latitude 40.1°).

Yield of 1 kWp
1,609kWh/year
Tilt
36°5° east of south
10 kW
16,089kWh/year
Row pitch
10.39m · GCR 0.46
Rank in the country
80of 147 cities

Ground frame designer

A ground frame for a solar plant: Cuenca

Latitude 40.1°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

108Jan111Feb135Mar137Apr150May154Jun170Jul166Aug145Sep129Oct101Nov103Dec

July: 170 kWh/kWp, November: 101 — 1.7 times less.

April: 137 against the median of 143 for the main cities of Spain, 4.2% less.

Cuenca: plants, kWh
kWpA yearJulyNovember
58,045850505
1016,0891,7001,010
1524,1342,5501,515

Fixed tilt facing south

What a table yields at another tilt than the optimal 36° — for roofs and frames with a standard slope.

Cuenca: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
36° (optimum)1,609—
15°1,520−5.5%
30°1,599−0.6%
45°1,595−0.9%
90°1,064−33.9%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.