Solar power plant in Torrejón de Ardoz, Spain: yield, tilt angle and row spacing

Torrejón de Ardoz: 1,627 kWh per kWp a year at the optimal tilt of 37°, 4° east of south (PVGIS). 0.7% above the median of the main cities of Spain (1,615). #61 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 46.0% more here.

Torrejón de Ardoz is in Community of Madrid. Population 118,162 (GeoNames). 588 m above sea level. 10 km away: Alcalá de Henares, the nearest bigger city, 1,615 kWh/kWp — 0.7% more here. 6.80 m between rows, pitch 10.62 m, GCR 0.45 (latitude 40.5°).

Yield of 1 kWp
1,627kWh/year
Tilt
37°4° east of south
10 kW
16,266kWh/year
Row pitch
10.62m · GCR 0.45
Rank in the country
61of 147 cities

Ground frame designer

A ground frame for a solar plant: Torrejón de Ardoz

Latitude 40.5°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

107Jan114Feb139Mar143Apr155May155Jun169Jul166Aug148Sep128Oct102Nov102Dec

July: 169 kWh/kWp, November: 102 — 1.7 times less.

September: 148 against the median of 143 for the main cities of Spain, 3.5% more.

Torrejón de Ardoz: plants, kWh
kWpA yearJulyNovember
58,133845510
1016,2661,6901,020
1524,3992,5351,530

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.