Germany: solar plant site data

Solar power plant in Leipzig, Germany: yield, tilt angle and row spacing

Leipzig: 1,081 kWh per kWp a year at the optimal tilt of 40°, 3° east of south (PVGIS). 3.4% above the median of the main cities of Germany (1,045). #49 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 3.0% less here.

Leipzig is in Saxony. Population 504,971 (GeoNames). 116 m above sea level. 101 km away: Dresden, the nearest bigger city, 1,071 kWh/kWp — 0.9% more here. 14.40 m between rows, pitch 18.06 m, GCR 0.26 (latitude 51.3°).

Yield of 1 kWp
1,081kWh/year
Tilt
40°3° east of south
10 kW
10,806kWh/year
Row pitch
18.06m · GCR 0.26
Rank in the country
49of 193 cities

Ground frame designer

A ground frame for a solar plant: Leipzig

Latitude 51.3°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb92Mar121Apr132May129Jun129Jul120Aug104Sep77Oct47Nov36Dec

May: 132 kWh/kWp, January: 36 — 3.7 times less.

December: 36 against the median of 30 for the main cities of Germany, 20.0% more.

Leipzig: plants, kWh
kWpA yearMayJanuary
55,403660180
1010,8061,320360
1516,2091,980540

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.