Germany: solar plant site data
Solar power plant in Hagen, Germany: yield, tilt angle and row spacing
Hagen: 1,003 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 4.0% below the median of the main cities of Germany (1,045). #166 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 10.0% less here.
Hagen is in North Rhine-Westphalia. Population 198,972 (GeoNames). 111 m above sea level. 17 km away: Dortmund, the nearest bigger city, 1,024 kWh/kWp — 2.0% less here. 14.11 m between rows, pitch 17.83 m, GCR 0.27 (latitude 51.4°).
- Yield of 1 kWp
- 1,003kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 10,031kWh/year
- Row pitch
- 17.83m · GCR 0.27
- Rank in the country
- 166of 193 cities
Ground frame designer
A ground frame for a solar plant: Hagen
Latitude 51.4°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
May: 122 kWh/kWp, December: 29 — 4.2 times less.
September: 95 against the median of 101 for the main cities of Germany, 5.9% less.
| kWp | A year | May | December |
|---|---|---|---|
| 5 | 5,016 | 610 | 145 |
| 10 | 10,031 | 1,220 | 290 |
| 15 | 15,047 | 1,830 | 435 |
Snow and wind loads
Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.
The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.
Nearby cities
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation, population and divisions (changed)
- Where to take snow and wind loads from: DIN EN 1991-1-3/NA, DIN EN 1991-1-4/NA
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.