Germany: solar plant site data

Solar power plant in Dortmund, Germany: yield, tilt angle and row spacing

Dortmund: 1,024 kWh per kWp a year at the optimal tilt of 39°, 2° east of south (PVGIS). 2.0% below the median of the main cities of Germany (1,045). #126 of 193 main cities of Germany by yield. For comparison, Kyiv: 1,114 kWh/kWp — 8.1% less here.

Dortmund is in North Rhine-Westphalia. Population 588,462 (GeoNames). 96 m above sea level. 32 km away: Essen, the nearest bigger city, the same 1,024 kWh/kWp. 14.30 m between rows, pitch 18.02 m, GCR 0.27 (latitude 51.5°).

Yield of 1 kWp
1,024kWh/year
Tilt
39°2° east of south
10 kW
10,237kWh/year
Row pitch
18.02m · GCR 0.27
Rank in the country
126of 193 cities

Ground frame designer

A ground frame for a solar plant: Dortmund

Latitude 51.5°: the tilt and the row pitch follow it. Enter the snow and wind for Germany in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb91Mar114Apr124May123Jun121Jul114Aug98Sep72Oct45Nov31Dec

May: 124 kWh/kWp, December: 31 — 4.0 times less.

November: 45 against the median of 43 for the main cities of Germany, 4.7% more.

Dortmund: plants, kWh
kWpA yearMayDecember
55,119620155
1010,2371,240310
1515,3561,860465

Snow and wind loads

Snow and wind loads for a site in Germany follow DIN EN 1991-1-3/NA (snow load zone, Schneelastzone) and DIN EN 1991-1-4/NA (wind zone, Windzone). Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Germany: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.

Nearby cities

Germany: all cities and regions

Sources

Preliminary calculation: a design needs an engineer’s check.