Solar power plant in Toraky, Vyzhnytskyi Raion, Chernivtsi Oblast
Toraky: 1,058 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 7.4% below the oblast median (1,143). #80 of 94 in the rayon, #407 of 422 in the oblast.
Vyzhnytsya, the rayon centre, is 26 km away. 636 m above sea level — above 500 m the DBN snow and wind are higher. 23 km away: Verkhovyna, the nearest bigger centre, 1,074 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 71 km. 10.47 m between rows, pitch 14.29 m (latitude 48.0°).
- Yield of 1 kWp
- 1,058kWh/year
- Tilt
- 37°1° west of south
- 10 kW
- 10,578kWh/year
- Row pitch
- 14.29m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Toraky
The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 71 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 123 kWh/kWp, December: 45 — 2.7 times less.
December: 45 against 37 in the oblast, 21.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,289 | 615 | 225 |
| 10 | 10,578 | 1,230 | 450 |
| 15 | 15,867 | 1,845 | 675 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Sokoliy1 km1,074 kWh/kWp
- Kyselytsi2 km1,033 kWh/kWp
- Polyakivske2 km1,089 kWh/kWp
- Hrobyshche3 km1,084 kWh/kWp
- Ploshchi3 km1,044 kWh/kWp
- Putyla3 km1,104 kWh/kWp
All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.