Solar power plant in Hrobyshche, Vyzhnytskyi Raion, Chernivtsi Oblast
Hrobyshche: 1,084 kWh per kWp a year, tilt 39° facing south (PVGIS). 5.1% below the oblast median (1,143). #60 of 94 in the rayon, #387 of 422 in the oblast.
Vyzhnytsya, the rayon centre, is 29 km away. 808 m above sea level — above 500 m the DBN snow and wind are higher. 24 km away: Verkhovyna, the nearest bigger centre, 1,074 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 74 km. 10.93 m between rows, pitch 14.65 m (latitude 48.0°).
- Yield of 1 kWp
- 1,084kWh/year
- Tilt
- 39°facing south
- 10 kW
- 10,838kWh/year
- Row pitch
- 14.65m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Hrobyshche
The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 74 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 120 kWh/kWp, December: 44 — 2.7 times less.
November: 62 against 47 in the oblast, 31.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,419 | 600 | 220 |
| 10 | 10,838 | 1,200 | 440 |
| 15 | 16,257 | 1,800 | 660 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Ryzha3 km1,029 kWh/kWp
- Toraky3 km1,058 kWh/kWp
- Sokoliy3 km1,074 kWh/kWp
- Putyla3 km1,104 kWh/kWp
- Kyselytsi4 km1,033 kWh/kWp
- Polyakivske5 km1,089 kWh/kWp
All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.