Solar plant: site data

Solar power plant in Putyla, Vyzhnytskyi Raion, Chernivtsi Oblast

Putyla: 1,104 kWh per kWp a year, tilt 40° 11° east of south (PVGIS). 3.4% below the oblast median (1,143). #43 of 94 in the rayon, #369 of 422 in the oblast.

Vyzhnytsya, the rayon centre, is 29 km away. 628 m above sea level — above 500 m the DBN snow and wind are higher. 26 km away: Verkhovyna, the nearest bigger centre, 1,074 — 2.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 71 km. 11.16 m between rows, pitch 14.82 m (latitude 48.0°).

Yield of 1 kWp
1,104kWh/year
Tilt
40°11° east of south
10 kW
11,038kWh/year
Row pitch
14.82m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Putyla

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 71 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

59Jan70Feb97Mar105Apr111May112Jun122Jul121Aug104Sep90Oct63Nov48Dec

July: 122 kWh/kWp, December: 48 — 2.5 times less.

November: 63 against 47 in the oblast, 34.0% more.

Putyla: plants, kWh
kWpA yearJulyDecember
55,519610240
1011,0381,220480
1516,5571,830720

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vyzhnytskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.