Solar plant: site data

Solar power plant in Yershov, Novhorod-Siverskyi Raion, Chernihiv Oblast

Yershov: 1,092 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.4% below the oblast median (1,108). #76 of 247 in the rayon, #1140 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 32 km away. 161 m above sea level. 32 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 118 km. 14.94 m between rows, pitch 18.66 m (latitude 52.0°).

Yield of 1 kWp
1,092kWh/year
Tilt
39°2° east of south
10 kW
10,922kWh/year
Row pitch
18.66m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Yershov

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 118 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan59Feb98Mar114Apr138May140Jun138Jul134Aug106Sep71Oct30Nov24Dec

June: 140 kWh/kWp, December: 24 — 5.8 times less.

November: 30 against 33 in the oblast, 9.1% less.

Yershov: plants, kWh
kWpA yearJuneDecember
55,461700120
1010,9221,400240
1516,3832,100360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.