Solar plant: site data

Solar power plant in Buka, Novhorod-Siverskyi Raion, Chernihiv Oblast

Buka: 1,091 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 1.6% below the oblast median (1,108). #96 of 247 in the rayon, #1182 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 32 km away. 167 m above sea level. 32 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 122 km. 15.01 m between rows, pitch 18.73 m (latitude 52.1°).

Yield of 1 kWp
1,091kWh/year
Tilt
39°3° east of south
10 kW
10,906kWh/year
Row pitch
18.73m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Buka

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 122 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan60Feb99Mar115Apr139May141Jun137Jul134Aug106Sep71Oct30Nov25Dec

June: 141 kWh/kWp, December: 25 — 5.6 times less.

November: 30 against 33 in the oblast, 9.1% less.

Buka: plants, kWh
kWpA yearJuneDecember
55,453705125
1010,9061,410250
1516,3592,115375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.