Solar power plant in Raihorodok, Novhorod-Siverskyi Raion, Chernihiv Oblast

Raihorodok: 1,104 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #40 of 247 in the rayon, #925 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 43 km away. 130 m above sea level. 37 km away: Shostka, the nearest bigger centre, 1,082 — 2.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 125 km. 14.14 m between rows, pitch 17.91 m (latitude 51.6°).

Yield of 1 kWp
1,104kWh/year
Tilt
38°1° east of south
10 kW
11,039kWh/year
Row pitch
17.91m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Raihorodok

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 125 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan61Feb97Mar116Apr141May142Jun140Jul137Aug108Sep73Oct33Nov23Dec

June: 142 kWh/kWp, December: 23 — 6.2 times less.

February: 61 against 57 in the oblast, 7.0% more.

Raihorodok: plants, kWh
kWpA yearJuneDecember
55,520710115
1011,0391,420230
1516,5592,130345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources