Solar plant: site data
Solar power plant in Zhernivka, Novhorod-Siverskyi Raion, Chernihiv Oblast
Zhernivka: 1,103 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #41 of 247 in the rayon, #951 of 1558 in the oblast.
Novhorod-Siverskyi, the rayon centre, is 46 km away. 123 m above sea level. 40 km away: Shostka, the nearest bigger centre, 1,082 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 123 km. 14.11 m between rows, pitch 17.88 m (latitude 51.6°).
- Yield of 1 kWp
- 1,103kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 11,033kWh/year
- Row pitch
- 17.88m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Zhernivka
The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 123 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 142 kWh/kWp, December: 23 — 6.2 times less.
February: 61 against 57 in the oblast, 7.0% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,517 | 710 | 115 |
| 10 | 11,033 | 1,420 | 230 |
| 15 | 16,550 | 2,130 | 345 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Chereshenky3 km1,101 kWh/kWp
- Raihorodok3 km1,104 kWh/kWp
- Vilne3 km1,106 kWh/kWp
- Vyshenky3 km1,104 kWh/kWp
- Chorniavka4 km1,102 kWh/kWp
- Zaitseve5 km1,106 kWh/kWp
All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.