Solar plant: site data

Solar power plant in Luknove, Novhorod-Siverskyi Raion, Chernihiv Oblast

Luknove: 1,101 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% below the oblast median (1,108). #47 of 247 in the rayon, #1014 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 47 km away. 129 m above sea level. 38 km away: Shostka, the nearest bigger centre, 1,082 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 129 km. 14.09 m between rows, pitch 17.86 m (latitude 51.6°).

Yield of 1 kWp
1,101kWh/year
Tilt
38°1° east of south
10 kW
11,008kWh/year
Row pitch
17.86m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Luknove

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 129 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan59Feb98Mar115Apr140May141Jun140Jul136Aug107Sep73Oct33Nov24Dec

June: 141 kWh/kWp, December: 24 — 5.9 times less.

January: 33 against 35 in the oblast, 5.7% less.

Luknove: plants, kWh
kWpA yearJuneDecember
55,504705120
1011,0081,410240
1516,5122,115360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.