Solar plant: site data

Solar power plant in Nekryte, Novhorod-Siverskyi Raion, Chernihiv Oblast

Nekryte: 1,094 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.3% below the oblast median (1,108). #68 of 247 in the rayon, #1121 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 48 km away. 133 m above sea level. 37 km away: Shostka, the nearest bigger centre, 1,082 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 132 km. 14.07 m between rows, pitch 17.84 m (latitude 51.6°).

Yield of 1 kWp
1,094kWh/year
Tilt
38°2° east of south
10 kW
10,935kWh/year
Row pitch
17.84m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Nekryte

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 132 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb98Mar115Apr138May140Jun139Jul136Aug106Sep72Oct33Nov25Dec

June: 140 kWh/kWp, December: 25 — 5.6 times less.

December: 25 against 24 in the oblast, 4.2% more.

Nekryte: plants, kWh
kWpA yearJuneDecember
55,468700125
1010,9351,400250
1516,4032,100375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.