Solar plant: site data

Solar power plant in Baranivka, Novhorod-Siverskyi Raion, Chernihiv Oblast

Baranivka: 1,060 kWh per kWp a year, tilt 39° 4° east of south (PVGIS). 4.4% below the oblast median (1,108). #246 of 247 in the rayon, #1548 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 66 km away. 127 m above sea level. 32 km away: Koryukivka, the nearest bigger centre, 1,085 — 2.3% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 94 km. 15.01 m between rows, pitch 18.73 m (latitude 52.1°).

Yield of 1 kWp
1,060kWh/year
Tilt
39°4° east of south
10 kW
10,595kWh/year
Row pitch
18.73m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Baranivka

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 94 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb95Mar111Apr134May137Jun135Jul132Aug104Sep69Oct29Nov23Dec

June: 137 kWh/kWp, December: 23 — 6.0 times less.

November: 29 against 33 in the oblast, 12.1% less.

Baranivka: plants, kWh
kWpA yearJuneDecember
55,298685115
1010,5951,370230
1515,8932,055345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.