Solar power plant in Yurkivka, Zvenyhorodskyi Raion, Cherkasy Oblast

Yurkivka: 1,133 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.9% below the oblast median (1,144). #191 of 197 in the rayon, #627 of 731 in the oblast.

Shpola, the rayon centre, is 22 km away. 137 m above sea level. 11 km away: Katerynopil, the nearest bigger centre, 1,140 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 85 km. 10.96 m between rows, pitch 14.83 m (latitude 49.0°).

Yield of 1 kWp
1,133kWh/year
Tilt
36°3° east of south
10 kW
11,332kWh/year
Row pitch
14.83m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Yurkivka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 85 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb91Mar118Apr139May141Jun147Jul143Aug116Sep87Oct39Nov26Dec

July: 147 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 28 in the oblast, 7.1% less.

Yurkivka: plants, kWh
kWpA yearJulyDecember
55,666735130
1011,3321,470260
1516,9982,205390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.