Solar plant: site data

Solar power plant in Bahachivka, Zvenyhorodskyi Raion, Cherkasy Oblast

Bahachivka: 1,137 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.6% below the oblast median (1,144). #171 of 197 in the rayon, #575 of 731 in the oblast.

Shpola, the rayon centre, is 22 km away. 144 m above sea level. 10 km away: Zvenyhorodka, the nearest bigger centre, 1,145 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 82 km. 10.99 m between rows, pitch 14.86 m (latitude 49.1°).

Yield of 1 kWp
1,137kWh/year
Tilt
36°3° east of south
10 kW
11,368kWh/year
Row pitch
14.86m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Bahachivka

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 82 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb91Mar118Apr139May142Jun148Jul144Aug117Sep88Oct39Nov26Dec

July: 148 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 28 in the oblast, 7.1% less.

Bahachivka: plants, kWh
kWpA yearJulyDecember
55,684740130
1011,3681,480260
1517,0522,220390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.