Solar plant: site data

Solar power plant in Sklymentsi, Zvenyhorodskyi Raion, Cherkasy Oblast

Sklymentsi: 1,139 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,144). #149 of 197 in the rayon, #531 of 731 in the oblast.

Shpola, the rayon centre, is 51 km away. 151 m above sea level. 17 km away: Korsun-Shevchenkivskyi, the nearest bigger centre, the same 1,141. Snow and wind from the nearest regional centre in the DBN — Черкаси, 76 km. 11.55 m between rows, pitch 15.37 m (latitude 49.4°).

Yield of 1 kWp
1,139kWh/year
Tilt
37°2° east of south
10 kW
11,389kWh/year
Row pitch
15.37m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sklymentsi

The designer opens with this place’s coordinates, latitude 49.4° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 76 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb96Mar117Apr138May141Jun145Jul142Aug115Sep85Oct38Nov27Dec

July: 145 kWh/kWp, December: 27 — 5.4 times less.

February: 58 against 55 in the oblast, 5.5% more.

Sklymentsi: plants, kWh
kWpA yearJulyDecember
55,695725135
1011,3891,450270
1517,0842,175405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.